Units and dimensions
- All calculations use millimetres internally with exact conversion constants.
- Usable WOF means fabric remaining after selvages; the editable default is 40 inches.
- Finished rectangle dimensions gain seam allowance on both opposite edges. Cut dimensions do not.
- Piece-level orientation and rotation choices override fabric defaults.
Fabric recommendations
Calculators first determine the layout or construction length, then add the selected safety allowance. Purchase length always rounds upward to the selected shop increment—never to the nearest increment or down.
Backing compares every valid panel direction and reports the lowest-yardage candidate without claiming it is always aesthetically preferable. Borders and sashing deduct fabric consumed by joins before counting WOF capacity.
Check a yardage result yourself
Open the Fabric Yardage calculator and use 24 pieces, each 3½ × 6½ inches, entered as cut sizes. In Advanced settings, use 40 inches of usable width, allow rotation, leave directional fabric off, choose 5% safety, and purchase in eighth-yard increments.
- Put the 6½-inch edge across the fabric: six pieces fit within 40 inches, using 39 inches across each row.
- Twenty-four pieces need four rows. Each row consumes 3½ inches down the bolt, giving 14 inches of cutting length.
- Five percent safety increases the purchase basis to 14.7 inches. Each eighth yard is 4.5 inches; rounding upward gives four increments, or 18 inches: ½ yard to buy.
Turning rotation off changes the answer. Eleven 3½-inch edges fit across, so three 6½-inch rows require 19.5 inches. With the same safety and rounding settings, purchase becomes 22.5 inches, or ⅝ yard. This is why usable width and orientation matter more than a simple area estimate. The yardage guide explains how to move from repeated rectangles to a mixed cut list.
Cutting planner priorities
When stock is available, the planner evaluates the requirements for each fabric together. Every piece must fit inside its assigned remnant or purchased fabric, without overlap and with its orientation respected. Enough combined area does not prove the pieces fit.
- Produce a valid plan that accounts for every requested piece exactly once.
- Prefer a lower raw additional purchase length.
- Prefer a practical cutting sequence and useful leftovers.
- Prefer lower waste after those priorities.
- Use stable tie-breaks so identical inputs produce identical output.
A fresh-fabric calculation has no stock to allocate: it prioritizes valid, practical cutting before lower fabric length and complexity. The optional pattern comparison uses this separate fresh-fabric scenario. It never substitutes your stock-aware shopping shortfall for the amount a pattern assumes you will buy from scratch.
Safety is added to new fabric purchases; existing remnants are not made larger or smaller by a safety percentage. If stock covers the selected plan, additional purchase stays zero. If you disable new purchases and stock does not cover the requirements, the planner reports the unallocated pieces rather than inventing extra fabric.
Large valid inputs use a simpler grouped heuristic with a visible warning so browser work stays bounded. The diagram projects the chosen optimizer placements; it does not calculate a second layout.
These are bounded practical searches, not proofs of a global minimum. Inspect the named fabric allocations, cutting list, and diagram together before cutting. See Read your cutting plan for a step-by-step check.
Testing and source conventions
Automated golden fixtures and invariants cover conversions, placement bounds, non-overlap, orientation, purchase bounds, determinism, backing coverage, HST yields, and joined-strip capacity. Conventions that vary in practice remain editable and are described as defaults.
- PreQuilt cutting-diagram explanation
- QuiltKeeper backing conventions
- Hailey Stitches HST method reference
These references provide context for quilting conventions. Where requirements vary, use your pattern, actual fabric measurements, and quilter's instructions. The backing-overage guide distinguishes the editable planning margin from a provider's real requirement. Report a reproducible discrepancy through Feedback.