Cut from named stock first

Existing-stock allocations are grouped by physical piece. Match each heading to the measured remnant or preset instance before cutting.

Then use the purchased-fabric plan

The purchased section contains only requirements not allocated to stock. Raw bolt length explains the geometry; Buy now includes safety and purchase rounding.

Instructions and diagram agree

Both are projected from the same placements. Use strip instructions where the geometry supports them. For irregular placements, follow the exact piece list and visual layout rather than inventing a simpler sequence.

Use zoom and the text version

Zoom changes only the on-screen view. Every diagram includes a complete text allocation with dimensions, piece groups, positions, and unused row width. The practical layout is deterministic but is not claimed as a proven global optimum.

Follow the material headings, not just the totals

For four 10 × 10-inch squares with one 20 × 10-inch remnant, the stock allocation accounts for two squares and the purchased layout accounts for the other two. Mark those two sources on your paper cut list before cutting. Do not cut all four from the new bolt just because Buy now shows a purchase; that amount assumes the named remnant is used as planned.

Read a leftover as a usable region

A listed leftover is a rectangle from a particular stock piece after its allocated cuts. Two leftover rectangles on different pieces are not one joined piece. Check the diagram's dimensions and the text positions against the real fabric, especially before a directional cut. If a warning describes a simplified planning method or an unmet requirement, resolve it before relying on the cutting instructions.

Inspect your cutting plan.